PEC-2026-023 · DMG MORI DMU 105 machine foundation · 210 Stanton St, Broussard LA · PRELIMINARY
Sawcut / new pad limitDMG envelopeMachine bodySupports A/B/C
Open this page in the Meta Quest 3 browser, then tap the button.
Layout setup
Quest controls
R trigger
Place. In 2-point mode: 1st pull = pad corner 1, 2nd pull = a point along the long edge.
L stick
Slide pad (12 in/s). Hold L grip for fine (1 in/s).
R stick ↔
Rotate (15°/s, fine 2°/s with R grip).
R stick ↕
Raise/lower if floor read is off.
A
Machine ghost on/off
B
Lock / unlock (locks out re-placing)
X
Switch 1-point / 2-point and start over
Y
Supports + envelope on/off
Hands
Pinch = trigger (place only)
Corner 1 = front-left corner of the pad as seen in plan (machine X → long edge). Readout panel rides on the left controller.
Flagged assumptions
Generic data. Envelope 209.1 × 128.5 in, body 160.8 × 108.3 in and supports A/B/C are from DMG MORI planning dwg 3075969 rev 011, not the order-specific installation drawing.
Body position inside the envelope is assumed (right/front aligned). Verify against the install drawing.
Machine height 118 in is approximate, for visual only.
Pad thickness 15 in is the open EOR hold (12 vs 15 in). Cut volume drawn to that depth.
Peripherals (band filter / coolant, up to 7.3 m overall) are not shown; extent to be confirmed on site.
AR placement is a visual aid only. Mark the sawcut with tape and dimension it from the gridlines or walls.