Cadorath AR Layout

PEC-2026-023 · DMG MORI DMU 105 machine foundation · 210 Stanton St, Broussard LA · PRELIMINARY
Sawcut / new pad limit DMG envelope Machine body Supports A/B/C
Open this page in the Meta Quest 3 browser, then tap the button.

Layout setup

Quest controls

R triggerPlace. In 2-point mode: 1st pull = pad corner 1, 2nd pull = a point along the long edge.
L stickSlide pad (12 in/s). Hold L grip for fine (1 in/s).
R stick ↔Rotate (15°/s, fine 2°/s with R grip).
R stick ↕Raise/lower if floor read is off.
AMachine ghost on/off
BLock / unlock (locks out re-placing)
XSwitch 1-point / 2-point and start over
YSupports + envelope on/off
HandsPinch = trigger (place only)
Corner 1 = front-left corner of the pad as seen in plan (machine X → long edge). Readout panel rides on the left controller.

Flagged assumptions

  • Generic data. Envelope 209.1 × 128.5 in, body 160.8 × 108.3 in and supports A/B/C are from DMG MORI planning dwg 3075969 rev 011, not the order-specific installation drawing.
  • Body position inside the envelope is assumed (right/front aligned). Verify against the install drawing.
  • Machine height 118 in is approximate, for visual only.
  • Pad thickness 15 in is the open EOR hold (12 vs 15 in). Cut volume drawn to that depth.
  • Peripherals (band filter / coolant, up to 7.3 m overall) are not shown; extent to be confirmed on site.
  • AR placement is a visual aid only. Mark the sawcut with tape and dimension it from the gridlines or walls.